Developer Not Fixing Snags in Dubai? Your Legal Options
Which deadline applies to your defect, the steps that work in order, and the evidence each step needs.
On this page
- Which deadline applies
- The escalation ladder
- What to put in a formal notice
- Why a technical report helps
- Complaint, court or arbitration?
- Developer not fixing snags: FAQs
Quoted after a short scope call, all costs listed upfront.
Get a quoteIf your developer is not fixing snags in Dubai, escalate in steps and build evidence at each one: follow up in writing, send a formal defect notice, back it with a technical report, then use the complaint or legal route your contract allows. First, check which legal deadline applies to each defect.
A dated, numbered record is what gives a stalled snag list weight. This guide sets out the order, the documents and the deadlines. It's written by inspection engineers; you can read more on the Property Snagging DXB website.
General information, not legal advice. For your own case, speak to a UAE property lawyer.
Which legal deadline applies to your defect?
Different defects have different protection periods. Check yours before you do anything else.
| Type of defect | Protection | Counted from | Law |
|---|---|---|---|
| Defective installations (electrical, mechanical, sanitary, sewerage) | Developer repairs or replaces for 1 year | Handover, or the completion certificate if the owner never took possession | Dubai Law No. 6 of 2019, Art. 40 |
| Structural defects | Developer liable for 10 years | The project's completion certificate | Dubai Law No. 6 of 2019, Art. 40 |
| Serious defects threatening stability or safety | Contractor and supervising engineer jointly liable for 10 years; claim within 3 years of the collapse or discovery | Discovery of the defect (for the 3-year claim) | Federal Decree-Law No. 25 of 2025 (Civil Transactions Law) |
| Finishes and other items | As set out in your SPA | Your contract | Your SPA |
Under Article 40, an agreement that removes these statutory protections is not valid, and your SPA may add extra warranties on top.
What are the steps when a developer won't fix snags?
Move up one step at a time, and keep everything in writing.
- 01
Follow up against the item numbers
Email the developer's customer-care or handover team, listing the open items by number, and ask for a repair date for each.
- 02
Send a formal defect notice
A clear, dated letter or email setting out each defect, when you found it, earlier attempts to get it fixed, your evidence and the remedy you want.
- 03
Get a technical report
An independent engineer's report describing each defect, its likely cause, whether it's structural and what repair it needs.
- 04
File a complaint
You can complain to RERA, the regulator within the Dubai Land Department, through the DLD website or the Dubai REST app.
- 05
Take legal advice on formal proceedings
Depending on your SPA, a dispute may go to the UAE courts or to arbitration. A lawyer can advise which applies and what to claim.
What should a formal defect notice include?
- Your name, unit number, building and handover date.
- Each defect, numbered, with its exact location.
- When you found each defect, and when you first reported it.
- Earlier repair attempts, and what happened.
- Dated photos, videos and any inspection report.
- The remedy you're asking for, such as repair or replacement, and a reasonable date.
Rule of thumb: write the notice so a stranger could understand the whole history without asking you a single question.
What to avoid while you escalate
- Relying on phone calls. If a promise is made by phone, repeat it back by email the same day.
- Letting the deadline pass. Note the anniversary of your handover date; send your written list well before it.
- Repairing it yourself first. Fixing a defect before it's documented can remove your evidence. Record it, report it, then ask the developer to act.
- Withholding payments without advice. Review your SPA and take legal advice before withholding a payment or refusing handover, since the consequences depend on your contract.
- Mixing new and old items. Keep the original item numbers; add new defects as new numbers, so the history stays clear.
Why does a technical report strengthen your case?
A developer can argue about a photo. It's harder to argue with an engineer's report that identifies the defect, its likely cause, whether it's structural and what repair is needed. In formal proceedings, a court may also appoint its own technical expert, and a clear report gives them something to start from.
Our handover snagging service produces dated, numbered reports you can attach to your notice. For a report prepared for a dispute, our third-party inspections work for neither side's outcome.
Should you file a complaint, go to court or use arbitration?
It depends on your contract and the problem. A RERA complaint is the usual first formal step for a developer not meeting its obligations. For a contract dispute, your SPA decides whether it goes to the UAE courts or to arbitration, and the standard DLD complaint process doesn't automatically resolve contract disputes. That's the point to involve a property lawyer.
Developer not fixing snags Dubai: FAQs
Is every defect treated the same way?
No. Ordinary snags, defective installations and serious structural defects have different protections and deadlines. Installations are covered for one year, structural defects for ten, and serious safety defects carry a separate claim deadline under federal law. Identify which applies before you escalate.
What should I do first when a developer won't fix defects?
Document everything: dated photos, videos and the history of your requests. Then send the developer a written notice listing each defect by number, with your evidence and the remedy you want. Most next steps depend on having that written record in place.
Why does a technical report matter?
It establishes what the defect is, its likely cause, whether it's structural, and the repair needed. That turns a disagreement about opinions into one about documented facts, and it gives a lawyer, a regulator or a court-appointed expert a clear starting point.
Where would a dispute with the developer be heard?
It depends on your SPA. Some contracts send disputes to the UAE courts, others to arbitration. A RERA complaint through the DLD is a separate route for regulatory issues. Read your contract's dispute clause and ask a property lawyer which route fits your case.